top of page
  • 7328 E Stetson Dr. Scottsdale, AZ 85251

  • Blvd. Luis Donaldo Colosio Murrieta 450,

    83250 Hermosillo, SON

    (Edificio Metrocentro Local 2 Piso 10)

  • Stay tuned for updates.

Engineering the future. © 2025 Ardebili Engineering.

Contact Us

info@Ardebilieng.com

Tel: 480-626-7072

When the MEP model falls behind, the whole project suffers

  • Writer: Ardebili Engineering
    Ardebili Engineering
  • Sep 5
  • 5 min read

The true cost of outdated models and how proactive MEP coordination keeps your project on track.


If you’ve ever asked yourself, “Why is this still showing up in the model?” you already know the answer.


The model was never updated.

Or maybe it was… somewhere. But not here. Not in your folder. Not in the viewer. Not in time.


The room layout changed. A floor elevation shifted. Structural penetrations were revised. But the MEP model didn’t reflect it. So now you're stuck sorting through discrepancies in a project that was supposed to be past that point.


And that’s where the real trouble begins.

Because what looks like a small oversight one file not updated, one duct run left unchanged starts a ripple effect that touches every team.


The pain point most teams don’t talk about enough

Outdated MEP model sharing isn’t exciting. It doesn’t make headlines in project recaps. It’s not a “wow” factor on a presentation slide.

But it’s one of the most consistent causes of missed coordination, schedule delays, and field frustration.


And the worst part?

It’s preventable.


If you’ve worked in architecture, structural or civil engineering, or general contracting, you’ve seen it firsthand:

  • Coordination meetings that go in circles because not everyone is looking at the same model

  • Design changes that get missed because the MEP team didn’t upload the latest file

  • Field teams that install based on outdated plans and get blamed for something they didn’t cause

It’s not just inefficient. It’s expensive.


Where it shows up and what it costs


Here’s how the impact shows up across the project team:


Architects

You finalize your layout and share it with the team. But days or weeks later, the model still reflects an old ceiling height or a previous shaft location. MEP systems are routed in spaces that no longer exist and your design decisions are quietly undone. Redraws follow. So do late RFIs.


Structural Engineers

You design to the last shared model. Your framing aligns with mechanical openings. You reinforce key areas. But the MEP team, working from an earlier version of your plans, reroutes a system that now cuts through your beams. You’re forced to redesign quickly, sometimes in the middle of CD production.


Civil Engineers

You’ve issued site utility plans. You’ve established tie-in locations. But then the plumbing team moves a connection. Or adds an unforeseen line. Now your slope doesn’t work. Your invert elevations are off. And you’re back in revision mode because the model you referenced wasn’t up to date.


General Contractors

You’re coordinating trades, planning sequences, verifying shop drawings. But the background the subs are using doesn’t match the one you saw last week. Installations clash with actual site conditions. The BIM coordination log grows. And your team spends time resolving what should’ve been caught in precon.


In each case, the mistake isn’t a technical one it’s a process failure. The model fell out of sync. And now everyone’s working twice as hard just to stay aligned.


Why it happens so often


This isn’t about blaming teams. Most delays in model sharing come from structural issues in the process itself.


1. Milestone only mentality

Many MEP consultants share models only at major design milestones 50 percent DD, 100 percent CDs, etc. But real world design evolves constantly. Between those milestones, there are dozens of shifts. When model sharing is tied only to deadlines, coordination always lags behind actual design.

2. Format misalignment

Even when the model is shared, it may arrive in the wrong format: a Revit file when the team needs IFCs or NWC exports for clash detection. Or a full BIM file when the contractor is simply trying to overlay PDFs for planning. If the format doesn’t match the need, delays follow.

3. Disorganized file sharing

One model lives in Box. Another is buried in an email. A third was sent to just one person on the team. Without a central repository, version control collapses. Teams don’t know which model is latest and the project starts splintering in different directions.

4. No summary of changes

Even when models are shared on time, they often come with no context. No one knows what changed. Teams have to run their own comparisons, or worse, they assume nothing changed and miss a major update. This is how things slip through the cracks.

5. No ownership of coordination

Too often, model sharing is treated as an upload task not a coordination responsibility. There’s no follow-up. No accountability. And as a result, critical design changes go unnoticed, or are discovered late, when they’re harder and more expensive to fix.


The cost in real terms

Poor model sharing slows down progress, but more than that, it shakes confidence.

A few examples we’ve seen:

  • A school project delayed because the MEP model didn’t reflect revised chase sizes, and new ductwork clashed with steel framing

  • A healthcare renovation with thousands of dollars in rework because electrical clearances weren’t coordinated in time

  • A retail project where underground utility conflicts forced a trench to be redone after it had already been poured


None of these issues were caused by design errors. They were caused by misalignment between what was drawn and what was shared.


The damage adds up:

  • Days lost to redesigns

  • Hours spent tracking changes

  • Thousands spent on change orders

  • Stakeholder trust eroded by inconsistencies

How Ardebili Engineering keeps your model (and your project) moving

We’ve built our process around one simple truth:If you want coordination to work, the model must stay current.


Here’s how we make that happen and why our partners trust us with complex projects.

1. We Don’t Wait for Milestones

We push model updates as needed not just at major deadlines. If a change affects your scope, we let you know right away. This keeps you aligned in real time, not just during formal reviews.

2. We Share in the Format You Need

We ask upfront what format you need and deliver accordingly whether it’s Revit, DWG, IFC, or NWC. You’ll never need to request a re-export or waste time converting files just to do your job.

3. We Organize Your Files

We use platforms like BIM 360 or your preferred system with clear versioning, folders, and date stamps. You won’t guess which file is latest you’ll know.

4. We Tell You What Changed

Every update includes a quick, clear summary of what changed. Whether it's a resized shaft, adjusted ceiling height, or revised system routing, we flag it so you don’t miss it.

5. We Stay in the Loop

We don’t disappear after uploading. We join coordination calls. We answer your questions. We revise as needed. We’re part of the team and that makes a difference.


The result: Better coordination, faster progress, less stress

When the model is always current:

  • Architects design with confidence

  • Structural engineers coordinate accurately

  • Civil teams avoid rework

  • GCs stay on schedule

  • Owners see a team that’s working as one

It may seem simple but getting the model right changes everything.

Because coordination doesn’t just happen on calls. It happens in the model. And when that model is clear, current, and accurate, the entire project benefits.


Model sharing isn’t an upload task. It’s a team strategy.

At Ardebili Engineering, we believe MEP coordination only works when it’s treated as a shared responsibility.


That’s why we don’t just deliver systems we deliver clarity.We don’t just share files we share ownership of the process. If you’re tired of chasing down the latest update, or constantly second-guessing what’s in the model we’re ready to help.

Because the model should be something everyone can trust.


And when it is, your project moves faster, smoother, and with far fewer surprises.

 
 
 

Recent Posts

See All

Comments


bottom of page