When the backgrounds don’t line up, no one wins.
- Ardebili Engineering

- Sep 4
- 3 min read
The real cost of misaligned drawings and how we fix them before they start.
You’re sitting in a coordination meeting. Everyone’s ready to review progress and finalize decisions but almost immediately, things go sideways.
Someone pulls up the latest MEP set and notices:
The grid lines are slightly off.
The stair core shifted but didn’t carry through to the electrical sheets.
The ceiling plan doesn’t reflect recent lighting updates.
A mechanical duct cuts through a structural beam that wasn’t there before.
Just like that, the meeting becomes a hunt for what changed, what’s missing, and who didn’t get the memo.
Sound familiar?
It should. Because even today in a world of Revit models, BIM coordination, cloud collaboration, and real time file sharing misaligned backgrounds are still one of the most common, most frustrating, and most avoidable issues in coordination.
The small oversight that creates a chain reaction
What seems like a small disconnect, a background that’s slightly out of sync ripples across the entire project.
The architect gets pulled away from design decisions to verify whether the team used the right version of the floor plan.
The general contractor delays their takeoffs while waiting for updated dimensions.
The structural engineer must review revised penetrations caused by misaligned ductwork.
The civil engineer must adjust site utility paths because the building footprint shifted.
And everyone leaves the meeting with more questions than answers.
It doesn’t matter whose "fault" it is. The damage is already done, lost time, reduced confidence, and a growing sense that the team isn’t working in sync.
Why does this keep happening?
Let’s be honest: this isn’t just about using the wrong PDF or forgetting to reload a Revit link.
It’s about:
Poor version control
Lack of standardized file naming
Teams working in silos
Rushed deadlines with no QA checks
Assumptions that “someone else will fix it”
And all of it points back to one thing: breakdowns in communication and accountability.
The real-world consequences
For Architects:
You carry the vision of the project. When your design isn’t accurately reflected in other disciplines’ drawings, it compromises your intent. Clients start questioning your control over the process. You end up spending valuable time redlining backgrounds instead of leading design.
For General Contractors:
You rely on accuracy for estimating, scheduling, and building. A single misaligned background can throw off material quantities, delay fabrication, or create rework in the field. This isn’t just inconvenient, it’s costly.
For Structural Engineers:
Even minor shifts in floor plans or slab edges can affect load paths, penetrations, and coordination zones. Misalignment means revisiting drawings that should have been locked.
For Civil Engineers:
When the building footprint moves without warning, site utilities, drainage, and grading are all impacted. Last minute changes introduce risk and erode schedule certainty.
What we do differently and why it works
At Ardebili Engineering, we treat alignment as a core part of our responsibility not just technically, but as a professional standard.
Here’s how we eliminate misalignment before it becomes a problem:
🔁 We Start With Version Discipline
We confirm architectural and structural backgrounds before every major milestone. Every time. No assumptions, no shortcuts.
🔍 We Overlay and Audit Internally
Before we submit, our team performs internal checks overlaying architectural, structural, and MEP models. We catch things before they ever reach your inbox.
👥 We Coordinate with All Disciplines
We don’t wait until the 90% submittal to reach out. Our process includes coordination checkpoints with architects, structural, civil, and GC teams throughout the project.
📣 We Speak Up
If something feels off, a missing room, an outdated link, a detail that doesn't make sense we don’t ignore it. We communicate. Because we care about the whole project, not just our piece.
More than just a line on paper
When backgrounds don’t align, the consequences go deeper than markups or RFIs. They impact trust, momentum, and morale.
But when coordination works really works everyone feels the difference:
Meetings stay focused and productive
RFIs drop
Installations go smoother
Clients notice the confidence and clarity
That’s what we aim for. That’s what our partners appreciate.
What our collaborators say:
“We didn’t have to ask twice. They were on top of version control before we even flagged it.
“They caught something structural missed and fixed it in coordination before it ever hit our desk.”
“Ardebili’s backgrounds align. That alone saves us days of coordination headaches.”
Let’s get everyone on the same page literally
The tools to get this right already exist. But getting it right takes discipline, communication, and a team that cares about your project.
If you're tired of fixing misalignments that shouldn’t exist in the first place, we’re here to help.